The China Grade Landfill Final Cover Project began in September of 2008 and will be completed near the end of April 2009. The scope of this project included capping the now closed landfill with 3-feet of compacted ET fill to promote water run-off and not allow any groundwater infiltration. The total volume of dirt to be moved was around 550,000 cubic yards. Other improvements included a storm drain collection system and basin, modifications to the existing Landfill Gas Collection System, concrete lined v-ditches, installation of geosynthetic membrane, erosion control measures, asphalt paving, extension of groundwater monitoring wells, and re-vegetation or portions of the landfill.